Get Your Sparkle Back
OraExpert Toothpaste
Your Smile, Redefined
Experience advanced oral care with therapeutic and cosmetic benefits.
Why Choose OraExpert Toothpaste?
OraExpert Toothpaste offers advanced oral care with whitening, stain removal, cavity protection, and gum health support for a confident smile.
Benefits:
- Everyday Use: Gentle and effective for daily oral care.
- Stain Removal: Removes surface stains for a brighter smile.
- Sparkling Freshness: Leaves your teeth sparkling and your breath fresh.
- Calculus Reduction: Helps reduce calculus buildup for cleaner teeth.
- Anti-Cavity: Protects against cavities with fluoride protection.
- Anti-Plaque: Fights plaque to maintain oral health.
- Oral Hygiene: Promotes overall oral cleanliness and gum health.
Summery
The benefits of OraExpert Toothpaste include protection against pathogenic & odour-causin bacteria, plaque, gingivitis, dental hypersensitivity, caries and calculus as well as whitening through extrinsic stains control. OraExpert toothpaste is the dentifrice that contains the combination of an advance formula to deliver therapeutic & cosmetics benefits.
Percent
0
Hexametaphosphate
Helps whiten teeth by removing stains.
Percent
0
Sodium Fluoride
Protects against cavities and strengthens enamel.
Powerful Ingredients
for a Brighter Smile
Our oral health products are crafted with powerful, natural ingredients that work together to give you a brighter, healthier smile. From teeth whitening to gum care, each product is designed to promote long-lasting freshness and improve your oral hygiene routine.
Why Choose OraExpert Mouthwash?
OraExpert Mouthwash offers advanced oral care with whitening, stain removal, cavity protection, and gum health support for a confident smile.
Benefits:
- Gingivitis
- Periodonotitis
- Oral Candidiasis
- Pre & Post-operative prophylaxis
- Denture Stomatitis
- Chlorhexidine is one of the most effective qantique agent
- Get absorbed by the tooth surface & Inhibits bacterial
- Colonization reduces of swelling gums
- Helps control bleeding gums
Mouthwash
Active Ingredient
0.12%
Chlorhexidine Gluconate
0.25%
Sodium Flouride
Clinically proven safety against Dental Stains
CHX 0.2% causes more stains on teeth as compared to CHX 0.12%
OraExpert mouthwash (Chlorehexidine Gluconate 0.12%) is more effective and safe in controlling Gingivitis and dental plaque and prevents dental stains as compared to chlorhexidine gluconate 0.2%